Project Details

  • Construction Date

    2006 - 2008

  • Location

    450 Sutter Street, San Francisco

  • Categories:

Project Description

Marchetti was hired by Harsch Investments to replace over 2,000 of the buildings existing steel window sashes and frames with new custom made aluminum window systems.  At the same time Marchetti performed a thorough restoration of the building’s terracotta skin.  This scope of work included fabrication and installation of replica terracotta tiles to match the hundreds of different relief types that were original to the building.  The project duration was nearly 20 months and was completed on schedule while the building remained fully occupied.